THIRD STAGE OF CONSTRUCTION OF ROAD INFRASTRUCTURE OF THE CENTRAL PART OF TBILISI

The third stage of construction of road infrastructure of the central part of Tbilisi is begun. At this stage, will be built ramps on the Kostava Street, Heroes' Square, near the Baratashvili bridge and in the right bank of the Mtkvari Riv., adjacent to the "Laguna Vere" pool.
In this project will be using the Reinforced Earth® technology and will be erected fourteen retaining walls.
Design work and quality control will produce the Reinforced Earth ® Insaat Proje ve Tic AS, a member of the Freyssinet Group.
Construction will be completed in 2012.

17.04.2012