Kostava Str., Territory Adjacent to the “Laguna-Vere” Swimming
Pool and Baratashvili Site Access Ramps Construction Project
Customer-Tbilisi City Hall
Design was developed by "Sakgzametsniereba" Ltd
Geotechnical survey was carried out by "ESG" Ltd (Kostava
and Territory Adjacent to the “Laguna-Vere” Swimming Pool Sites) and “Interproject”
Ltd (Baratashvili Site)
Contractor - "Caucasus Road Project" Ltd
Design of access ramps retaining walls - Reinforced Earth® Insaat Proje ve Tic A.S.
The project includes erection of 13 precast concrete panel retaining walls. Total area is 1240 sq. m.
Start - April 2012
End - September 2012