An article in the scientific, technical and industrial journal "Metallurgist" is published.
16.07.2013
The first stage of the Georgian-Italian
project "Creation the database and the prospects of use of kaolin clays of
Georgia...
24.07.2012
Contract for the design and supply of materials for
the erection of about 2000 sq. m retaining walls using new for Georgia GeoTrel®...
05.06.2012
The third stage of construction of road infrastructure
of the central part of Tbilisi is begun. At this stage, will be built ramps on
the Kostava Street, Heroes' Square...
17.04.2012
GSP Ltd and Dr. Gian Paolo Bertolotti from the Italian
Consulting Company “CERAMIN Consulting” began the Georgian-Italian project...
08.09.2011
In the June 2011 Caucasus Road Project
(CRP) was start the second phase of the road construction in the Vere
River Ravine. New road will connect Vake and Saburtalo districts of Tbilisi
02.06.2011
In the Proceedings of XIX Congress of the
Carpathian-Balkan Geological Association (September 23-26, 2010, Thessaloniki, Greece)
05.11.2010
Study of the ecological conditions in
the adjacent areas of the manganese (Chiatura – Imereti Region) and arsenic (Lukhuni
- Racha Region) deposits was started.
02.08.2010
Contract with Georgian company CRP Ltd
(Caucasus Road Project) for the erection of retaining walls and ramps in the
central part of Tbilisi is signed. The project...
05.01.2010
Our scientific paper "Production and Using the
Iron Ores in Georgia (Historical-Archaeological-Geological Study)" has been
published.
25.12.2009